We are particularly proud to announce that our MBT sleeve has received the AFCAB certification.
Leviat, a CRH company, is a global leader in connecting, fixing, lifting and anchoring technology for the construction industry.
Leviat’s engineered products and innovative construction solutions are used in a variety of market segments from residential to infrastructure, enabling users to build better, stronger, safer and faster.
3 000
employees
+60
sites worldwide
4
production on 4 continents
+30
sales in +30 countries
Blankenberge will soon have a brand-new sports complex and Leviat was allowed to contribute to
that.
We are particularly proud to announce that our MBT sleeve has received the AFCAB certification.
We imagine, model and make engineered products and innovative construction solutions for a dynamic industry. We support our partners in the long term to build better, safer, stronger and faster and help turn awe-inspiring architectural visions into reality.
Carboplate is a range of high strength and high elastic modulus carbon fibre pultruded flats, used for pressing reinforced and pre-constrained concrete or steel structures.
Carboplate can be a substitute for traditional steel plates commonly used during pressing interventions.
During laying, the temperature must not be below +5°C. The structure must be protected from rain and any dust carried by the wind.
After the intervention, keep the treated surface at a temperature above +5°C.
Protect from rain for 24 hours minimum if the temperature does not drop below +15°C, and for 3 days minimum if the temperature is below +15°C.
Carboplate is a range of high strength and high elastic modulus carbon fibre pultruded flats, used for pressing reinforced and pre-constrained concrete or steel structures.
Carboplate can be a substitute for traditional steel plates commonly used during pressing interventions.
During laying, the temperature must not be below +5°C. The structure must be protected from rain and any dust carried by the wind.
After the intervention, keep the treated surface at a temperature above +5°C.
Protect from rain for 24 hours minimum if the temperature does not drop below +15°C, and for 3 days minimum if the temperature is below +15°C.