AFCAB certificate for MBT couplers
We are particularly proud to announce that our MBT sleeve has received the AFCAB certification.
Leviat, a CRH company, is a global leader in connecting, fixing, lifting and anchoring technology for the construction industry.
Leviat’s engineered products and innovative construction solutions are used in a variety of market segments from residential to infrastructure, enabling users to build better, stronger, safer and faster.
3 000
employees
+60
sites worldwide
4
production on 4 continents
+30
sales in +30 countries
Blankenberge will soon have a brand-new sports complex and Leviat was allowed to contribute to
that.
We are particularly proud to announce that our MBT sleeve has received the AFCAB certification.
We imagine, model and make engineered products and innovative construction solutions for a dynamic industry. We support our partners in the long term to build better, safer, stronger and faster and help turn awe-inspiring architectural visions into reality.
The Aluminium frame allows implementing metal doors to form: composed of 2 magnetised elements of 15 kilos, adjustable in thickness for shells from 15 to 20 cm, it allows perfect positioning and holding of the door. It is compatible with all doors in the market.
Feet jacks allow the mannequin to be adjusted in height. <br/>Optional part for 25 cm shell. <br/>Mannequin rigidity is ensured by stiffeners. <br/>Accessories recommended: 6 mannequin magnets, type R600 or R610, with compensation cones to guarantee proper fitting of the frame.
1. Positioning of the first part
- Apply the stripping fluid on all faces.
- Mark a level reference line on the form panel.
- Define the door opening direction: right push or left push.
- Choose and position the first part of the mannequin.
- For the height adjustment, the top of the upper stiffener is located at 1 m from the top.
- Adjust the plumb line either with a level on the cross-piece, or with the PLAKAFil plumb line on the sides.
For increased safety, place two R600 magnets under the upper cross-piece.
Do not adjust the jacks at this step, to allow the passage of the frame spacer profile.
2. Fitting the metallic frame
- Fit the frame in place and adjust the jacks of the first part.
- Adjust the plumb line either with a level on the cross-piece, or with the PLAKAFil plumb line on the sides.
- Adjust the shims for the shell thickness: from 16 to 20 cm
3. Positioning of the second part
- Fit the second part of the frame mannequin.
- Add the 4 R600 magnets necessary for holding the mannequin at the time of concrete casting (you must have a total 6 R600 magnets with compensation cones).
- Adjust the two jacks by moving them so that they are just above the ground.
- Close the form panel.
The Aluminium frame allows implementing metal doors to form: composed of 2 magnetised elements of 15 kilos, adjustable in thickness for shells from 15 to 20 cm, it allows perfect positioning and holding of the door. It is compatible with all doors in the market.
Feet jacks allow the mannequin to be adjusted in height. <br/>Optional part for 25 cm shell. <br/>Mannequin rigidity is ensured by stiffeners. <br/>Accessories recommended: 6 mannequin magnets, type R600 or R610, with compensation cones to guarantee proper fitting of the frame.
1. Positioning of the first part
- Apply the stripping fluid on all faces.
- Mark a level reference line on the form panel.
- Define the door opening direction: right push or left push.
- Choose and position the first part of the mannequin.
- For the height adjustment, the top of the upper stiffener is located at 1 m from the top.
- Adjust the plumb line either with a level on the cross-piece, or with the PLAKAFil plumb line on the sides.
For increased safety, place two R600 magnets under the upper cross-piece.
Do not adjust the jacks at this step, to allow the passage of the frame spacer profile.
2. Fitting the metallic frame
- Fit the frame in place and adjust the jacks of the first part.
- Adjust the plumb line either with a level on the cross-piece, or with the PLAKAFil plumb line on the sides.
- Adjust the shims for the shell thickness: from 16 to 20 cm
3. Positioning of the second part
- Fit the second part of the frame mannequin.
- Add the 4 R600 magnets necessary for holding the mannequin at the time of concrete casting (you must have a total 6 R600 magnets with compensation cones).
- Adjust the two jacks by moving them so that they are just above the ground.
- Close the form panel.