AFCAB certificate for MBT couplers
We are particularly proud to announce that our MBT sleeve has received the AFCAB certification.
Leviat is a global leader in connecting, fixing, lifting and anchoring technologies for the construction industry.
Our engineered products and innovative solutions are used across a wide range of sectors, from residential to infrastructure, helping customers build better, stronger, safer and faster.
3 000
employees
+60
sites worldwide
4
production on 4 continents
+30
sales in +30 countries
Blankenberge will soon have a brand-new sports complex and Leviat was allowed to contribute to
that.
We are particularly proud to announce that our MBT sleeve has received the AFCAB certification.
We imagine, model and make engineered products and innovative construction solutions for a dynamic industry. We support our partners in the long term to build better, safer, stronger and faster and help turn awe-inspiring architectural visions into reality.
For the construction of your balanced stairway formwork, nothing is simpler than using telescopic tubes. These adapt perfectly to the length required and avoid long and cumbersome bevel cutting wood. The formwork of a balanced stairway becomes child's play and a very fast operation.
Once the tubes have been placed, just cover them with a reinforced bubble mat, and place your reinforcements and risers before concreting.
For a stairs with 16 steps of 1 m wide, you need:
- About 2 hours' work
- 90 tubes 92-160 and 10 146-200
A ceiling is required in the lower part
For the construction of your balanced stairway formwork, nothing is simpler than using telescopic tubes. These adapt perfectly to the length required and avoid long and cumbersome bevel cutting wood. The formwork of a balanced stairway becomes child's play and a very fast operation.
Once the tubes have been placed, just cover them with a reinforced bubble mat, and place your reinforcements and risers before concreting.
For a stairs with 16 steps of 1 m wide, you need:
- About 2 hours' work
- 90 tubes 92-160 and 10 146-200
A ceiling is required in the lower part