AFCAB certificate for MBT couplers
We are particularly proud to announce that our MBT sleeve has received the AFCAB certification.
Leviat is a global leader in connecting, fixing, lifting and anchoring technologies for the construction industry.
Our engineered products and innovative solutions are used across a wide range of sectors, from residential to infrastructure, helping customers build better, stronger, safer and faster.
3 000
employees
+60
sites worldwide
4
production on 4 continents
+30
sales in +30 countries
Blankenberge will soon have a brand-new sports complex and Leviat was allowed to contribute to
that.
We are particularly proud to announce that our MBT sleeve has received the AFCAB certification.
We imagine, model and make engineered products and innovative construction solutions for a dynamic industry. We support our partners in the long term to build better, safer, stronger and faster and help turn awe-inspiring architectural visions into reality.
Lightened thin wall; thin, lightened, high indoor and outdoor yield levelling
In cold weather:
- Check that the medium is not frozen and protect the product from frost for 24 hours after application.
- Mix with tepid water.
- Store the products away from cold and humidity.
In hot weather:
- Store Nivolite F in a cool place.
- Humidify the medium several times.
- Mix with cold water.
- After application, the surfaces will be protected during curing and hardening. To avoid too fast an evaporation, which is likely to cause superficial cracks due to plastic shrinking, spray water regularly during the first days or apply a curing agent compatible with the planned coatings.
Lightened thin wall; thin, lightened, high indoor and outdoor yield levelling
In cold weather:
- Check that the medium is not frozen and protect the product from frost for 24 hours after application.
- Mix with tepid water.
- Store the products away from cold and humidity.
In hot weather:
- Store Nivolite F in a cool place.
- Humidify the medium several times.
- Mix with cold water.
- After application, the surfaces will be protected during curing and hardening. To avoid too fast an evaporation, which is likely to cause superficial cracks due to plastic shrinking, spray water regularly during the first days or apply a curing agent compatible with the planned coatings.