AFCAB certificate for MBT couplers
We are particularly proud to announce that our MBT sleeve has received the AFCAB certification.
Leviat is a global leader in connecting, fixing, lifting and anchoring technologies for the construction industry.
Our engineered products and innovative solutions are used across a wide range of sectors, from residential to infrastructure, helping customers build better, stronger, safer and faster.
3 000
employees
+60
sites worldwide
4
production on 4 continents
+30
sales in +30 countries
Blankenberge will soon have a brand-new sports complex and Leviat was allowed to contribute to
that.
We are particularly proud to announce that our MBT sleeve has received the AFCAB certification.
We imagine, model and make engineered products and innovative construction solutions for a dynamic industry. We support our partners in the long term to build better, safer, stronger and faster and help turn awe-inspiring architectural visions into reality.
The watertightness sheet is a rough steel sheet placed in a concreting joint Partly anchored before each concreting stage, it extends the path of water which would otherwise cross this joint.
It concerns:
- Watertightness between a raft foundation and a shell
- Watertightness between two raft foundations
The junctions between the consecutive sheets are planned with a 200 millimetre overlap and are provided as required, as follows:
- The two ends of the two consecutive sheets are welded over the entire height
- The two sheets are spaced from one another by 5 centimetres
- The first end is smeared with "Swellseal hydro inflating putty" and the second end is then applied against the first. During concreting, the assembly must be held tightly using a clip.
The watertightness sheet is a rough steel sheet placed in a concreting joint Partly anchored before each concreting stage, it extends the path of water which would otherwise cross this joint.
It concerns:
- Watertightness between a raft foundation and a shell
- Watertightness between two raft foundations
The junctions between the consecutive sheets are planned with a 200 millimetre overlap and are provided as required, as follows:
- The two ends of the two consecutive sheets are welded over the entire height
- The two sheets are spaced from one another by 5 centimetres
- The first end is smeared with "Swellseal hydro inflating putty" and the second end is then applied against the first. During concreting, the assembly must be held tightly using a clip.