AFCAB certificate for MBT couplers
We are particularly proud to announce that our MBT sleeve has received the AFCAB certification.
Leviat, a CRH company, is a global leader in connecting, fixing, lifting and anchoring technology for the construction industry.
Leviat’s engineered products and innovative construction solutions are used in a variety of market segments from residential to infrastructure, enabling users to build better, stronger, safer and faster.
3 000
employees
+60
sites worldwide
4
production on 4 continents
+30
sales in +30 countries
Blankenberge will soon have a brand-new sports complex and Leviat was allowed to contribute to
that.
We are particularly proud to announce that our MBT sleeve has received the AFCAB certification.
We imagine, model and make engineered products and innovative construction solutions for a dynamic industry. We support our partners in the long term to build better, safer, stronger and faster and help turn awe-inspiring architectural visions into reality.
The aluminium wall end is a formwork which facilitates the sealing of concrete stops.It is made up of the following elements:
- Aluminium formwork face covered with lacquering, offering a flawless finish
- Integrated foam gasket ensuring a perfect seal
- Magnets incorporated in the profile to facilitate the positioning of the end piece on the metal sheet; 3 magnets per end piece.- 2 slings allowing transportation by crane
- Shutter at each end, preventing concrete from filling the profile
The end of the shell is made in one piece, which gives it more resistance
To considerably increase the lifespan of the formwork, consider cleaning it after use.
Quick implementation
- Position the end against the previously cleaned and degreased metal panel (for safety, attach the end to the top of the panel using a tie - in the form of either a wire or a strap).
- Adjust the position of the end.
- Attach - sink - remove.
- For better future use, consider cleaning the end of the shell.
The aluminium wall end is a formwork which facilitates the sealing of concrete stops.It is made up of the following elements:
- Aluminium formwork face covered with lacquering, offering a flawless finish
- Integrated foam gasket ensuring a perfect seal
- Magnets incorporated in the profile to facilitate the positioning of the end piece on the metal sheet; 3 magnets per end piece.- 2 slings allowing transportation by crane
- Shutter at each end, preventing concrete from filling the profile
The end of the shell is made in one piece, which gives it more resistance
To considerably increase the lifespan of the formwork, consider cleaning it after use.
Quick implementation
- Position the end against the previously cleaned and degreased metal panel (for safety, attach the end to the top of the panel using a tie - in the form of either a wire or a strap).
- Adjust the position of the end.
- Attach - sink - remove.
- For better future use, consider cleaning the end of the shell.