AFCAB certificate for MBT couplers
We are particularly proud to announce that our MBT sleeve has received the AFCAB certification.
Leviat, a CRH company, is a global leader in connecting, fixing, lifting and anchoring technology for the construction industry.
Leviat’s engineered products and innovative construction solutions are used in a variety of market segments from residential to infrastructure, enabling users to build better, stronger, safer and faster.
3 000
employees
+60
sites worldwide
4
production on 4 continents
+30
sales in +30 countries
Blankenberge will soon have a brand-new sports complex and Leviat was allowed to contribute to
that.
We are particularly proud to announce that our MBT sleeve has received the AFCAB certification.
We imagine, model and make engineered products and innovative construction solutions for a dynamic industry. We support our partners in the long term to build better, safer, stronger and faster and help turn awe-inspiring architectural visions into reality.
Reltec is a lost formwork system designed for making square and rectangular base concrete columns, either isolated or against existing constructions. Reltec is a set of elements made of high density polystyrene, coated on the inner side with plasticised wood panels. The angles are chamfered. The assembled elements are stiffened using reinforced tape.
This produces a rigid and light formwork resisting to pressure from the concrete without intermediate reinforcements for heights up to 4 m.
Throughout the project, it is advised to leave the formwork around the column to protect it. Architects are often so satisfied with the content of the rendering of the columns that they ask them to be left exposed.
1. The feet clamps are marked with the column axes, making their placement trivial, knowing that the formwork is round outside and square or rectangular inside. In addition, the small clamp feet take the formwork from the inside. The formwork is engaged easily on the clamp thanks to its feet being folded at 45°
Reltec is a lost formwork system designed for making square and rectangular base concrete columns, either isolated or against existing constructions. Reltec is a set of elements made of high density polystyrene, coated on the inner side with plasticised wood panels. The angles are chamfered. The assembled elements are stiffened using reinforced tape.
This produces a rigid and light formwork resisting to pressure from the concrete without intermediate reinforcements for heights up to 4 m.
Throughout the project, it is advised to leave the formwork around the column to protect it. Architects are often so satisfied with the content of the rendering of the columns that they ask them to be left exposed.
1. The feet clamps are marked with the column axes, making their placement trivial, knowing that the formwork is round outside and square or rectangular inside. In addition, the small clamp feet take the formwork from the inside. The formwork is engaged easily on the clamp thanks to its feet being folded at 45°